{"id":6976,"date":"2015-02-12T00:00:00","date_gmt":"2015-02-12T00:00:00","guid":{"rendered":"https:\/\/new-www.sii.pl\/case\/preparation-of-railway-traffic-control-software\/"},"modified":"2019-12-11T10:56:18","modified_gmt":"2019-12-11T10:56:18","slug":"preparation-of-railway-traffic-control-software","status":"publish","type":"case-study","link":"https:\/\/siisweden.se\/en\/case-study\/preparation-of-railway-traffic-control-software\/","title":{"rendered":"Preparation of railway traffic control software"},"content":{"rendered":"<h2>The challenge<\/h2>\n<ul>\n<li>Validation of existing technical documentation (Operation documentation) to increase its availability for engineers not associated with the railway industry.<\/li>\n<li>Relieving own engineers with a very tedious and time-consuming process of pre-testing of the individual stations.<\/li>\n<\/ul>\n<h2>What we did<\/h2>\n<ul>\n<li>We took over the competences of customers&#8217; engineers.<\/li>\n<li>We significantly improved the quality of Operation documentation.<\/li>\n<li>We took an active part in the tests of several stations, verified later by a committee and put into operation.<\/li>\n<\/ul>\n<h2>Effects<\/h2>\n<ul>\n<li>Raising the test standards by constantly eliminating the shortcomings of documentation.<\/li>\n<li>Gaining independence in the testing process.<\/li>\n<li>Paying attention to some existing logical inconsistencies due to &#8220;fresh look&#8221; at the issues.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The challenge Validation of existing technical documentation (Operation documentation) to increase its availability for engineers not associated with the railway &hellip; <a class=\"continued-btn\" href=\"https:\/\/siisweden.se\/en\/case-study\/preparation-of-railway-traffic-control-software\/\">Continued<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"template":"views\/single-old-case-study.blade.php","offering":[1650],"industry":[1656],"client":[1501],"technologies":[1819,3396,3394,1638,2199],"country":[],"class_list":["post-6976","case-study","type-case-study","status-publish","hentry","offering-testing-qa","industry-automotive","client-alstom-en","technologies-c-3","technologies-microsoft-net-2","technologies-power-builder-2","technologies-testing-and-qa-en","technologies-xml"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/case-study\/6976","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/types\/case-study"}],"author":[{"embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/users\/6"}],"wp:attachment":[{"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/media?parent=6976"}],"wp:term":[{"taxonomy":"offering","embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/offering?post=6976"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/industry?post=6976"},{"taxonomy":"client","embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/client?post=6976"},{"taxonomy":"technologies","embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/technologies?post=6976"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/siisweden.se\/en\/wp-json\/wp\/v2\/country?post=6976"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}